A total renovation of the old building in a partial phase so that the laboratory could still function while under construction.
To allow the gradual development, the program scheme still follow the old layout system. The idea was to create a big, open single storey reception and lobby area bathed in natural light, sounds of water feature and ponds, surrounded with three storeys of check-up rooms, laboratory and service area.